You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in or create an account, your edits will be attributed to your username, along with
other benefits.
The edit can be undone.
Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision |
Your text |
Line 3: |
Line 3: |
| == History == | | == History == |
| ==== Conception ==== | | ==== Conception ==== |
| Coinciding with the [[Pfhor]] attack on the [[New Cascadia]] colony on Tau Ceti IV in 2794, communications were lost between with [[Earth]]. Fearing anti-UESC groups had taken action or one of the AIs going [[rampant]], the UESC began drafting plans to re-establish contact with the colony and cement order. As well as a show of strength to the other factions within Sol. <ref name = "progodraft1"/> | | Coinciding with the [[Pfhor]] attack on the [[New Cascadia]] colony on Tau Ceti IV, communications were lost between with [[Earth]]. Fearing anti-UESC groups had taken action or one of the AIs going [[rampant]], the UESC began drafting plans to re-establish contact with the colony and cement order. As well as a show of strength to the other factions within Sol. <ref name = "progodraft1"/> |
|
| |
|
| ==== Development ==== | | ==== Development ==== |
| Planning for the project began in 2795, with the earliest known draft of the project dated October 20.<ref name = "progodraft2"> [https://www.marathonwiki.com/File:UESC_TSdocu_PROGO_memo_B95_DraftB.pdf ''Marathon'' (202X) ARG, Project_Goliath_DRAFT_B]</ref> Many concerns were raised at this stage, the main one being over the nature of the communication blackout. The document's commentary noted that the Marathon carried a [[Chevalerie-class AI|Chevalerie-Class AI]] aboard. This AI becoming rampant was one speculated cause of the blackout.<ref name = "progodraft2"> </ref> Another theory proposed was insurrection, as the colony had the capacity to quickly repair their communication array but hadn't.
| | {{stub}} |
| | |
| In the second known draft, dated October 22, 2795, raised even more concerns over the personnel roster. Specifically the inclusion of 48 purpose-built 3rd generation Mjölnir Mk VII-IX and Sharur Mk 2-6 [[Cyborg|cyborgs]].<ref name = ""progodraft3">[https://www.marathonwiki.com/File:UESC_TSdocu_PROGO_memo_B95_DraftE.pdf Marathon (202X) ARG, Project_Goliath_DRAFT_E]</ref> The commentary noted that cyborgs at the time of the ''Marathon's'' launch were dedicated weapons of war, and that sending any cyborg would be seen as an act of aggression.
| |
| | |
| These same concerns were also raised in an email chain between two unknown parties, regarding the project's rapid militarization by [[Mx Moreau]].<ref name = "email chain">[https://www.marathonwiki.com/File:UESC_docu_PROGO_digicorr_23072795.pdf Marathon (202X) ARG, Email Chain]</ref> In some drafts, the number of craft included in the mission reached as high as 14. Some of these ships as well, were specifically designed for orbital bombardment. Later drafts would see the cyborgs replaced by military clones and other military personnel reduced significantly.
| |
| | |
| ==== Final iteration ====
| |
| {{stub|section=y}} | |
|
| |
|
| ==== Leakage ==== | | ==== Leakage ==== |
Line 20: |
Line 13: |
| == Goals == | | == Goals == |
| {{stub|section=y}} | | {{stub|section=y}} |
|
| |
| == Notes ==
| |
| *Though there are only 3 drafts with actual text released, there are references to many others. A draft H is one of these drafts, but it has not been released as of yet. <ref name = "email chain">[https://www.marathonwiki.com/File:UESC_docu_PROGO_digicorr_23072795.pdf Marathon (202X) ARG, Email Chain]</ref>
| |
|
| |
|
| == References == | | == References == |